Field and Roof applications are power investments which should be studied independently. Pre-feasibility report is prepared after surveying geographical position, topography, structure and slope of land, position of land according to Sunwise, natural and legitimate thresholds of potential GES fields. In roof applications, Pre-feasibility report is prepared after surveying geograhical position of the building, position of building according to Sunwise and making statical and electrical calculations of building. Then, The report is offered before the offer.
Comments are closed.