1. Location Based Survey and Analysis
Field and Roof applications are power investments which should be studied independently. Pre-feasibility report is prepared after surveying geographical position, topography, structure and slope of land, position of land according to Sunwise, natural and legitimate thresholds of potential GES fields. In roof applications, Pre-feasibility report is prepared after surveying geograhical position of the building, position of building according to Sunwise and making statical and electrical calculations of building. Then, The report is offered before the offer.
2. Works Based City Development Plans
One of the most important pillars of a Solar Power Plant Project is to get legal status for the land in question. In this context, making site development project work in a correct, complete, planned way and in a short time,is a primarily matter to be adressed.
Certificate of Conformity (This is a GES Conformity Certificate which is taken before getting the approval for the site development project in question from Metropolitan Municipalities, District Municipilaties, The Ministry of Environment and Urban , The Provincial Directorates of The Ministry of Environment and Urban).
It includes Land Development Plan with scales of 1/5000, Land Development Plan with scales of 1/1000, Instutional Opinions about the plans, plan description report and plan provisions, mapping with scales of 1/5000 and 1/1000, Geotechnical Investigation based Development Plan and approval.
3. Projecting and Engineering
In the context of GES investment, A Project file including GES Certificate of Conformity, Electrical Projects, Statical Projects, Power Transmission Line Projects and technical calculations is prepared to be submitted for the approval of the relevant certifying organization TEDAŞ.
In this context, Turkuaz Mühendislik which is our solution partner in UCK Group has got projects of totally 29 MW approved. Projects of 93 MW are in the evaluation phase in Tedaş Organization.
4. Site Infrastructure Works Before Installation of The Equipments
– The excavation and leveling of the land
– The supply of construction materials , manufacturing and assembly.
– Preparing the foundation and concrete works
– The manufacturing and assembly of the metalic chain fences around the field.
5. GES Application and Integration
– Panel, DM and ENH Application Assembly
– Security Services, Manufacturing and Installation of Plant Door, Camera Systems and Cabling Services